HRS Updates 4/21/17

The shop is hopping with work! 3 major jobs are currently under way.
#1: The Moosilauke Lodge job will be starting really soon. I have made a site visit to measure up all that I need to get the guillotine door for the great room fireplace made. The place is magical! Have a look at this 3D walk through.

#2: Bridges Condo is a total renovation of a condo in Warren VT really close to Sugarbush Ski Resort. I was asked to create a stair guard/ hand railing and a fireplace surround. I’m hoping to be done with the surround by middle of next week. The architect will be over to make some finale design decisions on Tuesday.

#3: Kinny Project. This one is a really big job as well 110 feet of railings. Inside, outside, off the house, field stone core drilling for posts, cantilevered…… I’ll have all the bases covered on this job.